Skip to content
View in the app

A better way to browse. Learn more.

Forum Valentin Software

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
  1. Started by jakoz123,

    Maybe someone had the problem with automatic counting modules and kWp when you select modules? Text that don't display is for example: "5 Modules (1,5 kWp)". We have the newest version of the software. It's don't work just on one computer, on other it's fine.

  2. Started by LiamMay,

    I have a question regarding the usage of PVSol. The problem I am having is that once I have built a model of the building, using the Google Earth screenshot, then the "Sketch a 3D polygon" tool in the Object View, and extruded the building, placed various air-conditioning ducts on the roof using "Sketch a 3D polygon" - I then struggle greatly to properly orientate a module array either in module coverage or module mounting. For instance, once I have followed the steps above and am ready to place the array, (- Module Mounting - Select/edit Assembly System - Orientation), the final orientation selection is, at the moment for me, arbitrary and requires multiple guesses. It…

  3. Started by esteban_24,

    Good morning, My name is Esteban. I am user of PVSOl 2016. I am trying to simulate a real fothovoltaic plant. This plant has strings of 20 modules in series, but I couldn´t found the option in PVSOL to configure 20 modules in series, the value maximum possible is 14 modulues in series. I attached some images, the first one is the schema of real plant and the other is my simulation. How can I configure strings of 20 modules in series? Thanks. Best Regards, Esteban Ayala Chavarria SAWEWA int. esteban.ayala@sawewa.com cel: 3015202695

  4. ON TERRAIN PROJECTS, WE CAN'T PLACE MORE THAN 5000 PANELS. & ON TERRAIN PROJECTS WE CAN'T MAKE DC CONNECTIONS BETWEEN MODULES MANUALLY OR AUTOMATICALLY. EXPECTING YOUR HELP ON THE MATTER THANKS

    • 3 replies
    • 4.8k views
  5. I have PVSOL 7.0 R5 premium. When i go to regional options to set climate data, it is showing 'Pvsol 7.0 R5 Meteosyn Could Not Be Found. Please Reinstall the program'. However meteosyn was included in the setup. I installed it again but to no avail. I also installed the previous version of meteosyn on your downloads directory but it did'nt work. Please help

  6. Started by jerryg,

    Is there any option for exporting cable plan or roof layout to dxf? I can export the cable schematic in this format but not the roof layout from 3d design For the cable plan there is the option to print to A4 but what's best way to more detailed output? Thanks

  7. Started by ahmedzayen,

    hello, I have the premium PVSOL version 7.5 but the library of ABB inverter pimp many product how i can recover it

  8. Started by eayalach,

    Hello, My name is Esteban. I have PvSol 2016. I need to know how I can see some information about the different load profile like, the area(m2), the anual energy consumption(kWh/año). In the moment, I only can see monthly energy consumption in percentages(But I dont see the consumption figures). Thanks. Regards.

  9. Started by ndiorio,

    Hello, I'm trying to run a basic simulation with one module tilted 30% facing south (azimuth 180 degrees), with a wall partially obstructing the view to the south. I've setup the scene, and when I run it there are outputs: Area South: Irradiance onto tilted surface [kWh/m2] Shading [kWh/m2] I'm finding that the shading losses compared to the irradiance (which I assume is the plane-of-array quantity) are much lower than I would expect. For a full year, I'm seeing: Shading - 25 kWh/m2 Area South: Irradiance onto tilted surface 1921 kWh/m2. Which is a 1.3% annual loss. However, when I compare the PV energy (DC) to a case without the shading obstruct…

  10. Hello, I designed a roof mounted solar system and selected panels and inverters. When I reach to the cabling section sometimes the buttons are not active and all cabling is not shown. Sometimes the buttons are active and when I run "cable automatically" nothing happens. There are no cables shown on the panels. Is there something I missed during the configuration? How can I get this problem solved? Thanks

  11. Started by bernard,

    Dear PV*SOL community, I have a PVsys horizon profile file (.hor). Basically it's a text file containing pairs of Azimuth-Height values per each line. Height represents the value of the highest obstacle at certain Azimuth (Azimuths are direction from 0 to 360). Those obstacles, can be anything: buildings, trees, mountains... PVsys does not possess the ability of using Tree Transmitance values, so each tree is considered to be an opaque obstacle. On the other hand it looks like PV*SOL does possess this important feature by using Tree's Transmitance values. My first question is: When importing any sort of horizon file into PV*SOL, how does PV*SOL distinguish be…

  12. Hello, I have another problem with PVSOL Premium 2016 (R4). I don’t know how to create in 3D a building with oblique horizontal projection. I mean a building which does not have the rectangular base. The only way which I have found to do it is something like that : place one rectangular building place second rectangular building turn off obstacles detection of one of the two buildings then try to “slip” one building into another This is kind of solution but mapping the dimensions and shape of the object is very difficult. But there is a more important problem, when You do like I described above then You will have two separate roof surfaces which are penetrating …

  13. Hello, I recently purchased the PV-SOL Premium and I can't run simulations or reports because on the bottom of the page I read the error "First, please define a valid system in the 3D visualization". No matter what type of system I select I can't run any report in 3D. What do I need to do? Thanks, Tommaso

  14. Hello, I am trying to run a simulation for a system where I've set up a 3D shading scene. When I click to generate results, two simulations occur. The first is the calculation of shading losses. This appears to run for the full 365 days. The next simulation says "Simulating", but only runs until day 239 before stopping. Then, the "Hourly Values" csv file only has data until August 28. Is there a setting somewhere that would govern this behavior? Thanks

  15. Started by it.teated@energia.ee,

    Hi We have purchased a single-user license, which is installed on one workstaion. Does this license type allow using PV*SOL on the machine with Windows 7 Enterprise installed by 5 different users at different time via RDP ?

  16. Started by Boris,

    Hi, Is it possible to use the horizon line from the 3D images of Google Earth for the shadowing effect on the pv generator? Thanks. Regards, Boris

  17. Started by Low Carbon Exchange,

    Hi, Since upgrading PV Sol Premium to R4 and searching for the closest climate data to the site postcode it no longer places the site location on the map which makes it easier to select the closest climate file? Regards

  18. When I try to create/modify a PV data , on the Data Base , I get an error and PVSol stops and shutdown. I tried to update the Data Base, I reinstalled PVSol , but the problem persists. I cannot add or work with PV Data Base , all other Data Bases works fine (Inverters, Batteries, etc). We have PVSol on other computers and they work ok. Please help us with this issue. Please see attached error report ... .... Thanks.

  19. Started by Low Carbon Exchange,

    Hi, Can the diagram be exported or included in a report? Regards LCX

  20. I made a report for a customer and then I decided to activate another roof and fill it with solar panels. The problem is that I cannot generate any new results. Instead I get thrown into the reports area where all the buttons are shaded. What can I do to resolve this problem?

  21. Hi, I work in the Polish company and I use PVSOL Premium 2016 (R4). I have a problem with correct placement of objects in 3D workspace. I mean mutual arrangement of buildings, trees, etc. on the workspace in order to arrange them according to reality – mutual position and distance. The only way I have found to do it is the distance from the top of one object to the top of other object(distance x , distance y). But it works correctly only when you do not change the angle of the object. So you can place correctly all the objects assuming that all are facing south(180’). If you change the angle of one object the distance from top method do not work correctly or …

  22. The from-grid tariff facility in new PV*SOL Premium 2016 is too simple to be truly useful. It is becoming increasingly important when we model PV systems to calculate the potential savings on customer's billed usage. Most of our commercial customers are on time-of-use metering and in the previous PV*SOL Expert we could easily input these tariffs. I feel like the software has been impaired by removing this functionality. Are there any plans to reintroduce this feature? Now we are designing storage solutions, and this can have an even bigger impact on the sizing and cost-effectiveness projections. With the tariff data we could also predict good charging strateg…

  23. Hello, I am trying to import a load profile in .csv format but do not understand how the software interprets the data entered. If I am inputting a full year (365 days) with 15 minute minute intervals then there are 35,040 entries as noted by the software. Am I correct in assuming that the first entry (ROW 1) is at 00:00 on the first of January and the last entry (ROW 35,040) is at 23:45 on the 31st Dec? Also the software notes the following: Select the number format: - ####.## with a point, - ####,## with a comma or - #.####,## with thousand separators. If I select KW and on that particular entry the installation is demanding 30KW then would my ent…

  24. What is the procedure in defining solar module that is not listed on the database. I noticed a partial load model. this data is not on the manufacturers datasheet. is this data necessary?

  25. Started by Eddie,

    Please advise how to show modules on roof and place trackers on the grass area for presentation. See attachment! Thanks. Eddie

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.