Skip to content
View in the app

A better way to browse. Learn more.

Forum Valentin Software

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
  1. Started by j.walke,

    Hallo, was ist los mit PVSOL im Strangplan? Egal wie oft ich Module ersetze, es ändert sich nicht!

      • Thanks
    • 1 reply
    • 1.8k views
  2. Started by Jeel,

    I have added two datasheet of Luxor solar module, can you add this modules to PVsol modules database. LX_DB_EcoLine_M60_300-320W_DE.pdf LX_EL_HC_M120_FS_365-385W_166cs-DE.pdf

  3. In a case with PV and a battery the export power is limited to 0kW by feed-in clipping. The battery is charged/discharged according to a time schedule. Discharging of the battery is limited due to feed-in clipping, but it still affects the SoC. Therefore the battery is charged with energy from the grid more than it should. In the screenshots it's visible that the battery SoC is significantly reduced even though most of the power is clipped. The C10 of the battery is 462,3kWh, so the 3,7kWh discharge for consumption should only be 0,008 of the SoC but the change is much higher (although not exactly 86.281/462,3). In the annual figures it is also visible that as a…

    • 3 replies
    • 2.3k views
  4. Started by Pranav,

    Hello, I am trying to import the load profile from .txt file. but again and again its showing the error "Conversion error in the data line: 1." I have data for every 15 mins. 35040 total rows. columns does contain any headings. I hope to get some help from you.

  5. Started by Pranav,

    Helo Eveyone, I am trying to determine DC cable length of my 300kwp roof mounted pvsystem in pvsol. But the option cable Grommet is not working. even cable with option is also not there after right clicking on perticular inverter in cable plan.

  6. Hi all, Hoping someone can clear this up for me. I came across the Livoltek Hyper-5000 inverter in PVSOL. However, I noticed the PV panels where easily exceeding the Current of the inverter. I notice that the Input current & Short circuit current values (in the 'Electrical data- DC' section) are the same as the values on the MPP inputs ('MPP Tracker' section). However, should it not be the case that for the current values in the 'Electrical data - DC' section, the MPP current values are multiplied by the number of MPP trackers (in this case 2, as there are 2 inputs on this inverter). Thus, this would make the Input current & Short circuit…

  7. Started by Pedro,

    Sometimes when I make a change to the inverter configuration an error message "" appears, and when this message appears my entire file becomes unusable, how can I avoid it?

    • 2 replies
    • 1.7k views
  8. Good day, I'm trying to make a simulation using last years climate data, I managed to import the data, and everything looks good. But when I run the simulation I get barely any losses on "orientation and inclination of the modules surface". When I run the simulation with normal PVGIS-SARAH (Vijfhuizen) climate data I get 10,7% losses on orientation (the modules are 10° sloped facing north) When I run the simulation with last years (Koole-Vijfhuizen3) data I get 1,7% orientation losses. Everything with last years data seems realistic (temp, irradiaton, location etc.) Do you know why I get these big differences? Thank you in advance, Jan…

    • 2 replies
    • 1.7k views
  9. Started by CarlSEL,

    Hi, Can anybody explain to me why PVSol uses Meteonorm 8.2 but Solar Edge designer uses 7.1? When I run the same project on both design tools I get varied results. Thanks

      • Thanks
      • Like
    • 4 replies
    • 3.3k views
  10. Dear users, I have downloaded original SARAH and SARAH-2 datasets and in both of them around 0,2% of the data are having the gaps. Could you please tell me how you handl this in PVGIS, since in the end these are 0 hours, do you then fill it with ERA5 data or apply 0. Thank you very much in advance!

  11. Hi Team Valentin Software, For some inverters, MPPT trackers can accept more than one string (usually 2). PVsol doesn't usually indicate this when the inverter is selected. In the Configuration menu if I select for example a Huawei SUN2000-20KTL-M2, I get two sections to fill, MPPT1 and MPPT2. For MPPT1, two strings can be inputted. One of those strings is going to be connected straight to the first input (lets name it input MPPT1a) and for the other input (MPPT1b) I want to connect two strings using a Y(or T)-Connector. This separation between input a and b for every MPPT does not exist in PVsol, which leads me to the question, how can I achieve this separ…

    • 2 replies
    • 2.3k views
  12. hola buenas: Después de hacer numerosas instalaciones de Autoconsumo de potencias entre 5kWp y 200kWp, todo muy bien. Pero he tenido que diseñar una Planta fotovoltaica de 5MWp y resulta que me pone una limitación de 7500 modulos en el proyecto. Adjunto pantallazo. Esto me ha obligado a dividir mi Instalación fotovoltaica en 2 proyectos de PVsol, con 2 instalaciones de 2,5MWp cada una. Con el consecuente problema de que tengo 2 informes, en lugar de tener todo integrado en 1 solo Porque sucede esto ?? Hay manera de hacer una planta con mas placas ? saludos y gracias de antemano

  13. Started by KIMBA,

    Bonjour, je souhaite une étude réelle sur PVSOL PRENIUM dont je vais fournir les coordonnées du site. Mon investisseur me demande une étude réelle avant d'acheter la le logiciel. Je suis ok pour payer l'étude si quelqu'un peut m'aider. Cordialement.

    • 0 replies
    • 1.2k views
  14. Hello, I have planned a 60, 70 KW PV system with one SUNGROW inverter SHT20 and one SG12T and two SUNGROW SBR storage unit (25.6 kWh). In order to increase the level of self-sufficiency from around 31 percent to 70, 80 percent, I tried to increase the number of battery systems per group/storage (two groups each with an SBR 25.6 kWh storage). Unfortunately, the level of self-sufficiency does not change, even if I add 6 SBR 25.6 kWh storage units to each of the two groups. Why is that? (Watch pls my attachment) Thank you so much, Martin

      • Thanks
    • 1 reply
    • 1.6k views
  15. Started by Litiantian,

    as you can see in the image, there is a numer called losses due to charge/discharge. could you please explain what is this mean and how do you caulculate this number? theres is another number called lossed in batterie, could you please explain what is this mean and how do you caulculate this number?

    • 1 reply
    • 1.7k views
  16. How do I choose different battery modules for different energy storage inverters in an energy storage photovoltaic system? Currently, I only select one battery module as one of the multiple inverters in the battery interface. But I want to choose a different battery scheme for each inverter.

      • Like
    • 4 replies
    • 2.2k views
  17. Started by Gorka,

    CUAL ES EL MEJOR MODELO DE IRRADIACIÓN DIFUSA PARA UTILIZAR EN PROYECTOS EN ESPAÑA? QUIERO QUE LA GENERACIÓN QUE CALCULA EL PVSOL SEA LA MAS CERCANA A LA QUE CALCULA EL PVGIS.

    • 1 reply
    • 1.6k views
  18. Started by Pedro,

    I would like to use the file that Pvsol generates in 3D with the panels for other software, is this possible?

    • 1 reply
    • 1.6k views
  19. Good afternoon, I'm having an issue with a project that I've been designing. It is an 806kW project. I initially designed it with Q-Cell Q.PEAK DUO M-G11S+ 415W Rev1 which is on their database. I've redone the design with Q Cell 440W, which I've inputted on the database myself, and the overall annual production has reduced significantly even though the kWp is the same. I've interrogated the PV system energy details, and it appears the cause is the parameter titled - Reflection on the Module Interface. On the original design it was 0kwh/m2, but with the new panel, it's increased to -71kWh/m2. My question is, is there anything I can change on the module data…

    • 1 reply
    • 1.5k views
  20. The string diagram gets messed up when I use optimizers, It wont follow the order I have the panels in. Anyone know why?

    • 1 reply
    • 1.5k views
  21. I'm experiecing a problem in PVsol. I've chosen a 10kw Inverter with a 10kw battery, but after i chosen the battery it will not display anything at all in the production forecast. I've had this problem before when chosing other inverters and batteries before. This battery is the same manufactioner as the inverter and is 100% compatible so I dont really know what the problem is. Anybody that can help me? I attached the PVsol file if anybody wants to see the settings EKESLUNDA 132 - string inverter.pvprj

    • 1 reply
    • 1.6k views
  22. For the Open field, Can I use a mounting system like pvcase. I mean if I want to install frame mounting (3 rows and 30 columns in one frame). I am planning for 2 mwp solar park.

    • 3 replies
    • 2.2k views
  23. Started by CodrinSomesan,

    Dear colleagues, can we do system analysis of the use of high-capacity batteries in production systems with integrated delivery of production. Can we simulate the utility scale photovoltaic plant with battery (1-2Mwh) If yes! Please tell me where I can find study resources for this analysis. Thank you.

  24. So installing large batteries trend is increasing worldwide as people charge them at night rate and utilize their energy during day time (6AM-9AM). So do PVSOL Premium offers any option to charge the batteries during night hours (night tariff rate is quite low as compare to day tariff). Thanks

  25. Hello Valentin Team, I`ve created 3D project with bifacial modules (east/west) I don`t know if i do something wrong or there is a problem in aplication but in "Calculation": PV Generator Energy (AC grid) probably calculates energy only for one side. I`v done some tests and facade configuration heading to west producing the same amount of energy as bifacial setup heading to east/west. Calculation works correctly in 2D. Bifacial and facade projects included in attachment. Niemierzyno_1.pvprj Niemierzyno_1_proba_usun.pvprj Niemierzyno2d.pdf

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.