  1. Hello Mr. Elghobashy, In the 2D planning of PV*SOL you could use the roof view option. There you could enter the dimensions of the roof/area and for the walkways between the modules you can define restricted areas. The program calculates how many numbers of modules you can places on the defined roof/area. In the 3D planning it's pretty similar. You can define open areas, buildings etc. On the buildings and open areas you can place restricred areas, maintenance pathes or other objects. If you have defined everything you can place the module rows. They can be placed manually or automatic
  2. There is no hidden feature or anything else for that. PV*SOL don't calculate the P50 and P90 exceedance probabilities. Your Technical Support
  3. Hallo Solarfix, nein, dass geht leider nicht. Und das ist wirklich unschön, das sich, wie ja auch in Ihrem Fall, bei einigen Planungen Objekte vor der eigentlichen PV-Anlage befinden. Man sieht dann teilweise gar nichts mehr, sondern nur eine graue Wand vom Gebäude davor. Aber da soll sich in der nächsten Version was tun und Abhilfe geschaffen werden. Der Idealfall wäre natürlich eine freie Auswahl für das Bild. Ob das sofort umgesetzt wird ist aber noch nicht ganz sicher. In ersten Schritt soll auf jeden Fall die frei Sicht auf die PV-Anlage gewährleistet sein. Ihr Technischer Sup
  4. Hallo Solarfix, Nein, leider gibt es derzeit keine Möglichkeit einen Dachüberstand bei Gauben zu definieren. Um die benötigte Dachfläche zu erreichen könnten Sie im Moment nur die Gaube etwas größer definieren. Aber das muss dann natürlich auch mit dem Dach usw. passen. Ich trage es gleich mal als Featurewunsch ein. Ihr Technischer Support
  5. Hello Dallas, For safety reaseons we don't allow the upload of spreedsheets with macro in the forum. Maybe it helps if I describe the procedure. I opened your file "Simple HHM for PVSol (MSDOS).csv" and renamed the worksheet name into table. Afterwards I have opened the vba editor (ALT+F11). Then I have selected table on the tree view and copied the code into the editor (see attached screenshot, sorry but I only have it in German). Now I left the vba editor and ran the macro. Your Technical Support
  6. Hello DallasRead, You can try the following macro: ______ Sub Profile() Dim rowZ As Long Dim strPartstring() As String Dim strDelimiter As String 'Parameter definition Set curws = ThisWorkbook.Sheets("Table") 'Enter the name of your worksheet instead of "table" rowZ = 1 'starting row strDelimiter = "," 'Definition of the delimeter e.g. comma, semicolon, hyphen, etc. 'Add a new worksheet Sheets.Add ActiveSheet.Name = "Table2" 'Setting all data lines For x = 1 To 365 'Reading of the Strings strPartstring = Split(Trim(curws.Cells(x, 1).Value), strDelimiter) For a = LBound(
  7. Dear Planer, Yes, this is possible. In PV*SOL you can plan grid-connected pv systems with battery storages. All energy which cannot be used for the own consumption or for loading the batteries will be fed into the grid. Your Technical Support
  8. Hallo Solarfix, das geht über den Screenshotmanager. Gehen Sie dazu in der 3D-Visualisierung auf die gewünschte Ansicht und klicken Sie dann auf das Kamera-Icon. Dann öffnet sich der Screenshotmanager. Klicken Sie nun auf Auslöser und die aktuelle Ansicht wird als Screenshot erstellt. Diese Screenshots erscheinen dann auch in der Präsentation. Ihr Technischer Support
  9. Hello, @Aztec_Oli The message "Keine Leseberechtigung der Datei" appears if the file is opened in another program, e.g. Excel, at the time of import. Please close the file in the other program and retry the import. @DallasRead Unfortunately we don't have a macro for the conversion to one column. Your Technical Support
  10. Hello DallasRead, The data in the file don't have the right format. You have 365 rows representing the days and in the rows you have the values for the half hours. But the import in PV*SOL requires that every values has to be in a single row. So you should have one column with 17520 rows. It should look like this: 965.8 928.2 914 920.5 ... Best regards Your Technical Support
  11. The download of the new software release stops during the automatic update process. I got the message "The operation timed out" or "the time limit is reached".
  12. Während des automatischen Updates bricht das Programm das Herunterladen der neuen Software immer wieder ab. Es kommt eine Meldung, dass das Zeitlimit erreicht wurde oder "Operation Timed Out".
  13. What operating modes of the heat pump can be simulated in GeoT*SOL?
  14. Welche Betriebsweisen der Wärmepumpe können in GeoT*SOL simuliert werden?
  15. How can I add new collectors and change existing collector data in T*SOL?
  16. Wie kann ich in T*SOL weitere Kollektoren anlegen oder vorhandene ändern?
  17. Kann man in T*SOL eigene Anlagensysteme definieren?
  18. How can power optimizers taken into account in the 3D visualization?
  19. How can I create own feed-in or from-grid tariffs?
  20. Why do I get differences in yield in the simulation of different modules, although they have the same power and similar characteristics?
  21. The 3D visualization reports a z-buffer problem – what does this mean?
  22. Is it possible to also calculate the approximate investment costs for a PV system with Valentin PV programs?
×
×