CarlSEL Posted March 17 Report Posted March 17 Hi, When stringing is there a process after choosing meander? Most of the time when meander is chosen and then cable design. It automatically keeps the stringing as simple. Am i missing a step? Thanks Quote
hotline_oh Posted March 17 Report Posted March 17 Dear CarlSEL, Thank you for your inquiry. If you have already created a cable plan and subsequently make changes to the configuration, the cable/string diagram is not always updated. You must then delete the cable plan (press the ‘Delete all cables’ button), switch back to the Module configuration page and then back to the Cable plan page. Everything is then updated and the cables run in accordance with the configuration. Quote
CarlSEL Posted March 17 Author Report Posted March 17 21 minutes ago, hotline_oh said: Dear CarlSEL, Thank you for your inquiry. If you have already created a cable plan and subsequently make changes to the configuration, the cable/string diagram is not always updated. You must then delete the cable plan (press the ‘Delete all cables’ button), switch back to the Module configuration page and then back to the Cable plan page. Everything is then updated and the cables run in accordance with the configuration. Perfect, thank you Quote
jamesbm Posted 23 hours ago Report Posted 23 hours ago Same issue here. Is there no way to refresh the diagram without losing the stringing already completed? Quote
hotline_oh Posted 9 hours ago Report Posted 9 hours ago Hello, Thank you for your inquiry. You do not lose the configuration/stringing. You only update the cable plan if it does not match the configuration/stringing. We have now resolved the issue. From the next software update onwards, the cable plan will always be updated automatically. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.