March 17Mar 17 comment_20703 Hi, When stringing is there a process after choosing meander? Most of the time when meander is chosen and then cable design. It automatically keeps the stringing as simple. Am i missing a step? Thanks Report
March 17Mar 17 comment_20704 Dear CarlSEL, Thank you for your inquiry. If you have already created a cable plan and subsequently make changes to the configuration, the cable/string diagram is not always updated. You must then delete the cable plan (press the ‘Delete all cables’ button), switch back to the Module configuration page and then back to the Cable plan page. Everything is then updated and the cables run in accordance with the configuration. Report
March 17Mar 17 Author comment_20709 21 minutes ago, hotline_oh said: Dear CarlSEL, Thank you for your inquiry. If you have already created a cable plan and subsequently make changes to the configuration, the cable/string diagram is not always updated. You must then delete the cable plan (press the ‘Delete all cables’ button), switch back to the Module configuration page and then back to the Cable plan page. Everything is then updated and the cables run in accordance with the configuration. Perfect, thank you Report
August 11Aug 11 comment_21403 Same issue here. Is there no way to refresh the diagram without losing the stringing already completed? Report
August 12Aug 12 comment_21404 Hello, Thank you for your inquiry. You do not lose the configuration/stringing. You only update the cable plan if it does not match the configuration/stringing. We have now resolved the issue. From the next software update onwards, the cable plan will always be updated automatically. Report