CarlSEL Posted yesterday at 12:11 PM Report Posted yesterday at 12:11 PM Hi, When stringing is there a process after choosing meander? Most of the time when meander is chosen and then cable design. It automatically keeps the stringing as simple. Am i missing a step? Thanks Quote
hotline_oh Posted yesterday at 12:24 PM Report Posted yesterday at 12:24 PM Dear CarlSEL, Thank you for your inquiry. If you have already created a cable plan and subsequently make changes to the configuration, the cable/string diagram is not always updated. You must then delete the cable plan (press the ‘Delete all cables’ button), switch back to the Module configuration page and then back to the Cable plan page. Everything is then updated and the cables run in accordance with the configuration. Quote
CarlSEL Posted yesterday at 12:43 PM Author Report Posted yesterday at 12:43 PM So for example this? Quote
CarlSEL Posted yesterday at 12:46 PM Author Report Posted yesterday at 12:46 PM 21 minutes ago, hotline_oh said: Dear CarlSEL, Thank you for your inquiry. If you have already created a cable plan and subsequently make changes to the configuration, the cable/string diagram is not always updated. You must then delete the cable plan (press the ‘Delete all cables’ button), switch back to the Module configuration page and then back to the Cable plan page. Everything is then updated and the cables run in accordance with the configuration. Perfect, thank you Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.