Henrique Teixeira Posted Wednesday at 09:51 AM Report Posted Wednesday at 09:51 AM Hello, I have two questions regarding some projects with the propose to full feed-in the energy to the grid. I update today the PVSOL for de 2025 R3 version and this type of simulation has changed. For exemple, I made a 2D simulation for 12 MW tracking and 4 MWh of battery. It usually charges de battery only from de PV when it starts do generate power and after the battery becames full, it feed-in the energy to the grid. The only shedule that I made is for discharging between 0:00 and 04:00 o'clock. I do not ativate charging periods. With this update, sometimes to charge the battery it consumes from grid (charging from grid). I do not want that, How can I limit that? Other question. It is possible to enable charging only after the PV Power became above the clipping power? Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.