Hi,

I am designing a large university campus that has one main MPAN Meter with one Half Hour Data values.

Due to the size of the site I have had to split the designs across two saved files.

Can you tell me how I can create a single production, PR, export, own consumption and self sufficiency for the site overall?

I can download the simulation values on excel but was wondering what values I would need to calculate to create the above overall values. Mainly own consumption and self sufficiency.

 

Thanks

 

 

Posted

Dear CarlSEL,

Thank you for your inquiry.

We recommend that you create an overall plan in 2D in addition to the 3D planning of the two partial areas.

Enter all module areas on the ‘PV Modules’ page. For each module area, enter the shading determined in the 3D planning. On the ‘Inverters’ and ‘Cables’ pages, transfer the configurations from the 3D planning. On the ‘Presentation’ page, download the project report as a doc file and insert the images from the 3D visualisation using Word.

3D:

image.jpeg

  2D:

image.jpeg

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...