November 13, 20241 yr comment_17919 Hi, I am trying to finish one of my projects and cabling was mostly done automatically. However, for some reason one roof (flat) did not cable (even though string is as it should be). When I try to cable manually, there is no option to put cable on grommel anywhere - in fact, I cannot make any cabling manually for any roof type. Please see attached photo of a Cable Plan menu where there are no visible options that usually are, such as Cable, Cable Nodes etc. Why is that? How I can finish the project? Thank you. Best regards, Rok Report
November 13, 20241 yr comment_17920 Dear Rok, Thank you for your inquiry. Unfortunately, the cable plan is not available for elevated systems or for polystring configurations. There is only the automatically created string plan, which is based on the configuration. Report
November 13, 20241 yr Author comment_17921 11 minutes ago, hotline_oh said: Dear Rok, Thank you for your inquiry. Unfortunately, the cable plan is not available for elevated systems or for polystring configurations. There is only the automatically created string plan, which is based on the configuration. Hi, thank you for your answer. For this particular roof there is no cable on the string plan. So I get every time notification that "at least one cable is incomplete". What can I do to overcome this? Thank you. Report
November 14, 20241 yr comment_17928 Dear Rok, Thank you for your message. This notification has no influence on the correct simulation and can be ignored. Report
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.