Ykulkarni Posted July 1 Report Posted July 1 Hi forum team, I am trying to simulate a behind the meter PV+Storage system in PVSol. I have two questions regarding my project: 1. Can you please help me understand where to add the grid export limit information? My project has a 180KW export limit granted by the distribution grid operator. 2. I want to use the BESS to maximise self-consumption. Do I need to look at "Own Power Consumption" or "Level of Self-Sufficiency" parameter in the production forecast section of the project documentation? Â Thank you for your help! Quote
developer_fw Posted July 10 Report Posted July 10 Hello Ykulkarni On 7/1/2024 at 3:51 PM, Ykulkarni said: 1. Can you please help me understand where to add the grid export limit information? You can set a power clipping via Options > Project Options > AC Mains > Maximum Feed-in Power Clipping On 7/1/2024 at 3:51 PM, Ykulkarni said: 2. I want to use the BESS to maximise self-consumption. Do I need to look at "Own Power Consumption" or "Level of Self-Sufficiency" parameter in the production forecast section of the project documentation? Yes, that is a first indicator. For dimensioning it might be helpful to not only maximize self-sufficiency but also have a look into what is possible economically. Therefore it is useful to analyse the simulation results with a focus on the size of energy shifts and power limitations i.e. is your battery system able to consume and provide as intended. Does this help? Kind regards Frederik Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.