anees Posted September 27, 2022 Report Posted September 27, 2022 Our customer is asking if we can do the following Day (24h) generation profile (mid-week; mid-winter): to provide a ‘snap-shot’ as to how the generation profile would be when each plant is fully operational during the shorter days) Day (24h) generation profile (weekend; mid-winter to provide a ‘snap-shot’ as to how the generation profile would be when each plant is not fully operational during the shorter days, i.e. baseload only) Day (24h) generation profile (mid-week; mid-summer): to provide a ‘snap-shot’ as to how the generation profile would be when each plant is fully operational during the longer days) Day (24h) generation profile (weekend; mid-summer): to provide a ‘snap-shot’ as to how the generation profile would be when each plant is not fully operational during the longer days, i.e. baseload only) is that possible ? Quote
developer_fw Posted September 28, 2022 Report Posted September 28, 2022 Hi anees, you could stack several load profiles, e.g. base load + a weekend profile + a week profile, simulate your plant and have a look at the simulation data. Since it is hard to boil down everything onto one or two days to make a claim, you could plot the data of several days of a certain period overlayed. Unfortunately this is not possible within PV*SOL, you have to use the export function on the page Presentation: I hope this helps. If you have further questions, feel free to ask! Kind regards, Frederik Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.