Jump to content

anees

Members
  • Posts

    52
  • Joined

  • Last visited

Everything posted by anees

  1. hello i want to check my inverter input power as accurate as i can from pvsol so i simulate it with one mintue interver QUESTION this one mintue interval shows average value of its sum of one mintue ? @developer_cd @developer_rh
  2. Hello Hope that you all are good and thanks for helping me everytime here i want to want to know what is best model for irradiation on inclined plan ? Perez?? 2) what is best model for diffuse irradiation?? Project locations are UK and Germany Thanks
  3. i think 3502*0.4= first year saving
  4. why these 2 values are differnt ? test (1).pdf
  5. @developer_fw any update on modules on database?
  6. PV generator output 9.43 kWp Specific annual yield 695.83 kWh/kWp Plant utilization ratio (PR) 74.64 % Yield reduction due to shading 5.5%/year PV generator energy (AC grid) with battery 6.346 kWh/year under yield it says annual yield is 6,346 kWh per year and not 9.43*695.83=6561.67 why?
  7. can you please add 410w from this datasheet thanks jolywood-410w-bifacial-glas-glas-black-datenblatt.pdf
  8. @developer_fw how much time it will take ?
  9. hello i want to use 3 battery of byd but there is no byd in database can pvsol team add this for me ? i can to use this 3 x BYD HVM 22.1 i also attach file of project and datasheet 1.pvprj 2.-BYD-BATTERY-BOX-PREMIUM-HVM.pdf
  10. how i can check my pvsol license expire date
  11. can we charge battery from grid and pv on pvsol
  12. thanks for reply i want to make this 12% how i can
  13. hello i want to fix shadiing losses in 2022 r6 premium how i can?
  14. hello i am using 2022 pvsol. if i install new update my license will still work?
  15. @developer_mh you are amazing big thanks man
  16. @developer_mh please check either i have right concepts or nor i want to feedin extra energy (at 0.045) to grid ( no limit ) and i did it in rate 1.PNG attachment is that okay? is it nessary to use the same in fianacical analysis page ( this is also attach) to make it easy for understanding please check my COMBINE ATTACHMENT.PNG please Thanks for your help
  17. Hello i can not understand why it shows financing or 26 years. project assessment period is just 25 years i already post how to hide it but my customer want to know why we show 26 years. pv file is attach. i also attach my related post thanks @developer_fw option 2 max fit using 440mwh.pvprj
  18. but why it shows 26 years ? it should show 25
  19. Hello i can not understand that what is price sold to thirld party means? i mostly use grid feed in and my grid feed in 0.045 question where i need to define it in feed in trafic or in price sold to thirld party??
  20. hello can i show financing of 25 years instead of 26? assesment period is 25 and screenshot is attach
  21. Hello pelase check that i have 2 rates, day and night rates day rate is = 0.429 night rate is = 0.3028 can you pelase check my rates that i put on pvsol is that okay?
  22. Hello can anyone tell me please how i can master all paramerts of pvol finanincing. Please remember i want to know all about it
×
×
  • Create New...