Skip to content
View in the app

A better way to browse. Learn more.

Forum Valentin Software

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Connection Of Two Diffrent Roofs (Inverter Connction)

Featured Replies

To whom it may concern,

 

When trying to conncect two modules, i receive 2 degree error. Any idea on how to fix that?

 

Thanks a lot in advance

post-571-0-01709600-1440844315_thumb.png

Hello Emre,

 

If I see it right from the screenshot then you are trying to group modules with different orientations (310° and 130°). This is not possible. Only modules with the same orientation and tilt (+/- 2°) can be gouped.

 

Best regards

 

Your Technical Support

Dear Emre,

 

If you plan in 3D you can use the “Configure all unconfigured modules” button in the module configuration window to select all modules.

 

Configure_all%20_unconfigured_modules.jp

 

If you are in the inverter selection window you should find your two roof areas (e.g. east and west). Please mark both by using the Control (Ctrl) key and the left mouse key. If you have done it right both areas are marked in blue and the icon "Configure selected module areas together" is activated. Click the icon and both areas will be merged. No you can select a suitable inverter.

 

Configure_selected_module_areas_together

 

You need to find an inverter with two or more MPP trackers. It is not possible to connect modules with a different tilt or orientation to one MPP tracker in the program.

 

Best regards

Your Technical Support

  • 2 years later...

Hi,

just a short update: In the meanwhile we fully overhauled the design and simulation of PV plants with varying module areas. You can now build any configuration you want with the new 'Polystring feature'. For example:

  • Two module areas on one MPP tracker
  • Different module types in one string
  • Parallel connection of strings with different number of modules
  • etc etc

It is available in PV*SOL premium 2018.

https://www.valentin-software.com/en/news/product-news/new-pvsol-premium-2018-import-3d-models

Martin

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.