Jump to content

GIM

Members
  • Posts

    9
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by GIM

  1. Dear Frederik, Thanks for such a nice tutorial. I didn't know that way of configuring. Thanks. but still have the question. I select modules from different rows to configure it to one 50kW inverter which has one MPPT (6 strings x 24 modules per string). Therefore I need some modules from the end of one row and some from the start of the next row to be connected to the same string (let say 4pcs from one row and the rest 20pcs from the second one). Overlapping of modules is not a problem. Also strings must be more as possible on the same row. But I'm getting result as below... Where am I wrong?? Thanks
  2. Good day to all. Each time I project a large landscape plant I have trouble with module strings configuration. I can do vertical and horizontal configuration, but it doesn't separate full length of line in parts but go through all the length of line. Then I need to place strings by hand.... It's so annoying. Guess I don't know some special way to configure it... Attached is a photo of my new plant and the marked part is reconfigured by hand. May there be some possibility to do it automatically for a full project by program?? Many thanks
  3. Hi. I got the message when I'm importing 3D model after creation it with Sketchup. Is my computer too low or??? Any suggestions?? Thanks
  4. I'm doing it by adding chimneys on each side of the roof with parapet wall measurements.
  5. GIM

    Net metering

    To not open new topic writing here. How to input tariff right. Have such a situation: I have price of energy I buy from the grid (0,15eur/kWh) Also I can save my power "in the grid" when sun is shining and plant producing more than needed and return kWh when is needed (night time or winter) for 0,05eur/kWh. Also I sell the annual rest to the grid provider for the fixed price (0,04eur/kWh). I use the "Net-Metering" method. Also fulfilling "Net-Metering tariffs" with "Tariff period 1" "Energy price" 0,15, "Compensation for Surplus" 0,04 with "annual accounting". And the question is how I need to enter a tariff for my saved and after returned power??? Thanks for your support.
  6. Hi for everyone. After import Sketchup made 3D roof to PV sol I'm getting mixed plane. Any ideas where I'm wrong? Thanks
  7. GIM

    export 3d building

    Thank You, Martin.
  8. GIM

    Height Value

    When you put in value, you need to enter coma but not the dot.
  9. GIM

    export 3d building

    I have several same building project buildings in different cities. It could be cool to make 3D plan in one city and after just copy ready made 3D to another map on new PVSol project. But I can't find such possibility. Could you please help me? Thanks
×
×
  • Create New...