In TSOL 5.0 I have used a process system A.13 with undersized storage to collector array and I have noticed

energy balance on report does not work out, what is happening here? There is electric boiler backup to process.

If I increase the storage amount by 50% the energy balance works out.

Posted

Hi Couloireric

could you please write down the terms

belonging to the balance, from your point of view?

Did you take the tank losses into account?

What collector size, process heat demand and 

tank volume did you use?

You can also attach your project (*.tsproj) file.

Kind regards

Posted

Hi Eric,

our simulation is based on intervals with a length of 6 minutes.

If some temperatures or volume flows change to abruptly, 

we reduce the interval to 1 minute.

In your scenario you have large volume flows. If the 

tank's volume is exchanged completedly within a simulation

intervall (6 or 1 minute), we will get balance errors.

The system A13 is not suited to simulate with such

a small tank.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...