Jump to content

Simulation Using REC Twin panels


Ahmad Elghobashy

Recommended Posts

Dir Sir/Madam,

I am Ahmad Elghobashy from Egypt, I was planning a project and I tried to run the simulation using the REC panels, with the Twin and PERC technology, but surprisingly I get a very low ySpec. annual yield 784.3 kWh/kWp, and a PR of 37.1% 

what do you think goes wrong with these panels?

* I am attaching a screen-shoot for the run results

REC.JPG

Link to comment
Share on other sites

Daer Ahmad,

If we do a simulation, according to your specifications, we get a specific annual yield of ~1800 kWh / kWp and a PR of 88%.

We do not believe that this is due to the REC modules, rather to the climatic data used.

Have you checked the annual sum of global irradiation.

Please send us your project file then we can take a look at it:

hotline@valentin-software.com

Regards

Your Technical Support

Link to comment
Share on other sites

Daer Ahmad,

Your problem is indeed based on the module dataset used.

The REC data set you used is available in a newer version in the database. If you select the new one, then the specific annual yield as well as the PR are as expected.

Kind regards

Your Technical Support

2017-09-17_REC twin panels simulation_v5.0_VAL.pvprj

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...