Aboud Posted January 9, 2023 Report Share Posted January 9, 2023 Dear All I wander how to configure the software to achieve the following: % solar used on site without storage is c.50% Kindly see the example below for a clear explanation: Total AC output: 131294kWh Direct PV to loads = 62702 kWh which corresponds to 47.8% of the Total AC output above. What I am looking for is how to tell the software to utilize 50% of Total AC output directly to the loads leave the other 50% for the storage and grid feed-in? Please let me know if you need a further info! Regards Quote Link to comment Share on other sites More sharing options...
Aboud Posted January 17, 2023 Author Report Share Posted January 17, 2023 Hello, Any help would be appreciated! Thank you Quote Link to comment Share on other sites More sharing options...
developer_mh Posted January 17, 2023 Report Share Posted January 17, 2023 Dear Aboud, the fraction of the generated PV energy that can directly be used by the loads is not a design parameter but a result of the simulation. In order to get more own consumption you would have to tweak e.g. the load profile (use a profile that matches the PV generation profile a bit better). In this manner you can get closer to the result that you want to get. But you can't just input On 1/9/2023 at 3:19 PM, Aboud said: % solar used on site without storage is c.50% It really depends on a lot of factors, like the simultaneousness of PV and load, the respective power values and more. Hope that helps, kind regards, Martin 1 Quote Link to comment Share on other sites More sharing options...
Aboud Posted January 17, 2023 Author Report Share Posted January 17, 2023 16 minutes ago, developer_mh said: Dear Aboud, the fraction of the generated PV energy that can directly be used by the loads is not a design parameter but a result of the simulation. In order to get more own consumption you would have to tweak e.g. the load profile (use a profile that matches the PV generation profile a bit better). In this manner you can get closer to the result that you want to get. But you can't just input It really depends on a lot of factors, like the simultaneousness of PV and load, the respective power values and more. Hope that helps, kind regards, Martin Many thanks martin As far as I understand, the more the load value is closed to the PV installed capacity 'Regardless other factors like location, etc' the more PV is is directed to load? Could you mention a trick/ parameter in the software which will change the amount of PV to load when modified? Regards Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.