How to assign % of the total AC output to be fed directly to the load?


Aboud

Recommended Posts

Dear All

 

I wander how to configure the software to achieve the following:

% solar used on site without storage is c.50%

 

Kindly see the example below for a clear explanation:

image.thumb.png.01d7048d7bfe592862322268e01ae7d9.png

Total AC output: 131294kWh

Direct PV to loads = 62702 kWh which corresponds to 47.8% of the Total AC output above.

 

What I am looking for is how to tell the software to utilize 50% of Total AC output directly to the loads leave the other 50% for the storage and grid feed-in?

 

Please let me know if you need a further info!

 

Regards

Link to comment
Share on other sites

  • Aboud changed the title to How to assign % of the total AC output to be fed directly to the load?

Dear Aboud,

the fraction of the generated PV energy that can directly be used by the loads is not a design parameter but a result of the simulation. In order to get more own consumption you would have to tweak e.g. the load profile (use a profile that matches the PV generation profile a bit better). In this manner you can get closer to the result that you want to get. But you can't just input

On 1/9/2023 at 3:19 PM, Aboud said:

% solar used on site without storage is c.50%

It really depends on a lot of factors, like the simultaneousness of PV and load, the respective power values and more.

Hope that helps, kind regards,

Martin

  • Thanks 1
Link to comment
Share on other sites

16 minutes ago, developer_mh said:

Dear Aboud,

the fraction of the generated PV energy that can directly be used by the loads is not a design parameter but a result of the simulation. In order to get more own consumption you would have to tweak e.g. the load profile (use a profile that matches the PV generation profile a bit better). In this manner you can get closer to the result that you want to get. But you can't just input

It really depends on a lot of factors, like the simultaneousness of PV and load, the respective power values and more.

Hope that helps, kind regards,

Martin

Many thanks martin
As far as I understand, the more the load value is closed to the PV installed capacity 'Regardless other factors like location, etc' the more PV is is directed to load?

Could you mention a trick/ parameter in the software which will change the amount of PV to load when modified?

 

Regards

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...