Jump to content

michalmitro

Members
  • Posts

    8
  • Joined

  • Last visited

Everything posted by michalmitro

  1. I'm having a same issue. could you please post a solution to this problem? thanks
  2. hello ive just replied to you. could you please take a look and get back to me soon? thanks michal
  3. did u have a chace to take a look? thanks
  4. thanks! just sent you a message michal
  5. Exported another project, same weired results. yields are overestimated by some unknown factor. either im missing something, or its a bug from the latest version. it was not giving me these numbers before i updated.
  6. I've just exported an output of the project. its yearly yield is calculated at 16047kwh while the financial gain per year is calculated to be 128556,1czk. I set the buying tariff to 3.5czk per KwH. when you divide the numbers there is no way this can ever fit. any ideas why this is so? as it is now, it is confusing to say the least... i am attatching enlish documentation for more details Medlov 223 eng.pdf
  7. Hello I do not understand why the values calculated by PVSOL in Cable Plan step of the 3d design are not automatically transmitted to the Cable tap in the following tab in PVSOL. The software knows the absolute cummulative values (positive, negative, inverter...) but prtends to have no clue how long the actual cables should be and leaves it up to users to try to guess from the pictures (since there are no measurement options either). To me this is hard to understand why this is not already integrated in the system. Can I make a feature request for this to be included in the comming update? Even if the values where estimates (ofcourse real situation requires some overhead) it would be of great help. Now its just annoying and far from accurate to do this manually... Thanks for the consideration Michal
×
×
  • Create New...