Jump to content

Burak

Members
  • Content Count

    3
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Burak

  • Rank
    Newbie
  1. Hi Martin, thank you for detailed and valuable information. When I checked in internet, direktvermaktung cost is 0,4 ct/kWh. I would like to ask more: If I choose this Martkprämie in PVSOL, how/where can I include that Direktvermarktungkosten in PVSOL? Thanks in advance! Burak
  2. Hey Everyone, I was simulating some systems and realized that there are two EEG in PVSOL which are named as EEG and EEG Marktprämienmodell. Can you please inform me, what the difference is. Thanks!
  3. Hey People, I was trying to do simulation and the system size is around 2 MWp. But when I try to save or run the simulation, I get a failure as " An error occurred in the application." Can you please tell me what is the problem with that? I am doing simulation in deskto-pc and my ram is 16 GB with CPU AMD Ryzen 3 3200G with Radeon Vega Graphics 3.60 GHz.
×
×
  • Create New...