How To Process More Than 5000 Panelson A Pvsol Projct


emre kaynak

Recommended Posts

Dear emre,

 

ON TERRAIN PROJECTS, WE CAN'T PLACE MORE THAN 5000 PANELS.

 

If you plan in 3D then the maximum number of modules is limited to 5000. The only way would be to plan it in the 2D mode.

 

You could try to simulate a small "reference" part of the system in 3D, just some example rows. After the simulation you will get a percentage of yield reduction due to shading in the project report. Afterwards plan the system in 2D and enter the percentage value in the losses window under losses due to soiling. The losses window can be found in the pv modules window under the link "Additional parameters".

 

ON TERRAIN PROJECTS WE CAN'T MAKE DC CONNECTIONS BETWEEN MODULES MANUALLY OR AUTOMATICALLY.

 

The cable plan option in 3D is only available if you plan with the module coverage. If you plan with module mounting then this option cannot be used.

 

Best regards

 

Your Technical Support

Link to comment
Share on other sites

  • 9 months later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...