Hi Guys,
I was wondering what profile start date I need to select when re-importing exported PVSol simulation data. What I have done is modelled an old system with degradation against a customers consumption profile (Which is the reduce grid consumption from this old system) and added the OPC consumption back into that profile as we trying to show the benefits of refreshing the old panels. When I exported the consumption data and opc the date format is 01.01.
So I'm wondering what do I need to set the profile start date with re-importing via measured values as I do not want to screw the week days in the simulation.
Many Thanks
Lee