Everything posted by Jens Soerensen

  1. We have a system where we combine two modules on each MMP 1 and 2, but the system wont allow this, is there a bypass or another way to configurate this with one Inverter we uses CIGS 480-195 and CIGS 480-150 - Green Energy Scandinavian A/S each module have same voltage so fx. 6.21 KW we combine 2x9 strings of 150w on one MPP and 2x9 strings of 195w on the other MPP
×
×