Jump to content

Mark Culpin

Members
  • Posts

    3
  • Joined

  • Last visited

Everything posted by Mark Culpin

  1. Hi I am having prblems getting into the cable plan area. I have configured the inverter OK, but the work area for cable plan remains blank. I would appreciate your help with this Thanks
  2. Hello Frederik Thanks for looking at this. I think I have sorted the problem out - I was trying to merge two PV areas which were at a different elevation, so the merge option remained greyed out, which is right. Thanks Mark
  3. Is it possible within PVSol to split a string between two separate rooves, for example 10 modules on Roof1 in series with a further 10 modules on roof 2 forming a single 20 module string which can then be connected into an MPPT
×
×
  • Create New...