Jump to content

Gary Zhou

Members
  • Posts

    21
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

Gary Zhou's Achievements

Apprentice

Apprentice (3/14)

  • One Year In Rare
  • Collaborator Rare
  • One Month Later
  • First Post
  • Conversation Starter

Recent Badges

0

Reputation

  1. Based on the sliding-scale tariff in the power bill, I synchronized the prices in the software. At the same time, I set the energy balance to net-metering. After running the simulation, I found that the costs without the solar energy system have a large discrepancy compared to the prices in the electricity bill. It's too higher than reality. Did I make any incorrect settings?
  2. Do the software consider the degradation of energy storage when calculating the return on investment? I updated the DOD of the battery's discharge cycle in the settings. Also, could you clarify what 'SOC battery' means on the result interface? Does this imply that the solar system hasn't fully charged the battery?
  3. Is there a way to intelligently adjust the inverter power based on real-time consumption tracking to ensure the grid export from the inverter is zero?
  4. PV CD -315kWp.pvprjHello, In this file, I set operation time to 2023/1/1,which is Sunday. And i set no consumption at weekends. But i checked the hourly values , there was still consumption on that day. The table shows that there was no consumption on January 3rd and 4th. There should be a problem with the setup. Please help to check. PV CD -315kWp.csv
  5. Can't save the name after changing it in new version. Reference name would be saved as Load Profile no matter what you filled in.
  6. I built a new structure with walls on the roof of the building. In the previous version, I could select the upper surface and then put the PV modules. But not now, I can't go to the top surface even I click the top arrow . This is a common problem, and not just in this file. PV DAKOKO - 副本.pvprj
  7. The layout were finished but I can no longer access the Results page. I have configured the inverter and no errors have been reported. Could you help me to check with that. Thank you. PV MYZ 4MW -220506.pvprj
  8. And after deleting some buildings ,I can get the result what I what. Actually I have changed all MaxNumber to 40 in that text editor.
  9. Thanks for your patient help. But after changed the data you mentioned , I can get only energy in kWh/m2. May I get result per module area what I mentioned before because it includes more details? Such as PV surface and yield for every building.
  10. And why simulation has no results per module area like that in picture? It's very important to my analysis.
  11. Operation time is in the time frame of Feed-in / Export Tariff vaildity . But no result for electricity export. PV MHS offical.pvprj
  12. There is a problem in the red box when I want to proceed to the next step. How to solve it? Thank you. HCP 220211 sungrow.pvprj
  13. Thanks for your clear explanation Martin. The first table comes from manufacturer. I will check with them.
×
×
  • Create New...