Dear colleagues,
can we do system analysis of the use of high-capacity batteries in production systems with integrated delivery of production.

Can we simulate the utility scale photovoltaic plant with battery (1-2Mwh)
If yes! Please tell me where I can find study resources for this analysis.

Thank you.

  • 5 weeks later...
Posted

Hello CodrinSomesan,

please excuse my late reply.

On 3/26/2024 at 3:59 PM, CodrinSomesan said:

Can we simulate the utility scale photovoltaic plant with battery (1-2Mwh)

Yes, you can plan and simulate large systems with far more than 2 mWh per year in PV*SOL. To get an impression, I recommend taking a look at our example projects "Bifacial PV Modules" (3D Editor) or "Solar Park Neuhardenberg" (2D Editor). You can find the example projects at the bottom right of the PV*SOL welcome page under "Example Projects".

In general, it is also possible to plan a large system with a high-capacity battery storage system. However, a consumption must also be defined for this.

Does this answer your question? I'm not sure, what you mean by "systems with integrated delivery of production".

Kind regards

Mikio

  • Like 1
  • 4 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...