Skip to content
View in the app

A better way to browse. Learn more.

Forum Valentin Software

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Large scale projects

Featured Replies

Bigger area with more then 10.000 PV panels - when this will be available in PV Sol Premium?

System with trackers simulation in 3D mode - when this will be available in PV Sol Premium?

Net - Metering to allows a customer who is generating more electricity than they are consuming to export that excess energy to the electric grid, receiving a virtual credit in kilowatt-hours (kWh)

 

Hi aleksandar.vajs,

thanks for your questions.

On 1/3/2024 at 2:55 PM, aleksandar.vajs said:

Bigger area with more then 10.000 PV panels - when this will be available in PV Sol Premium?

In the 3D environment it is not planed to support more than 10.000 roof parallel Modules. For large roof parallel systems we recommend to split the system into sub-projects.

For mounted open space systems we recommend to pick a small representative part of the system with less than 7.500 modules, simulate it to get the value for the "Yield reduction due to shading" in percent and then switch to a new 2D project. In the 2D projects it is possible to simulate up to 100.000 modules per module area (the number of module areas is unlimited). In the "PV Module" section of the 2D project on the left panel under "Shading" you can enter the shading value in percent, that you calculated before.
image.png

image.png

On 1/3/2024 at 2:55 PM, aleksandar.vajs said:

System with trackers simulation in 3D mode - when this will be available in PV Sol Premium?

PV systems with tracking in the 3D environment will probably not be implemented. The cost of implementation exceeds the benefits and the demand for PV systems with tracking is also low. For the creation of PV systems with tracking, 2D planning must still be used.

 

On 1/3/2024 at 2:55 PM, aleksandar.vajs said:

Net - Metering to allows a customer who is generating more electricity than they are consuming to export that excess energy to the electric grid, receiving a virtual credit in kilowatt-hours (kWh)

I am unsure whether I have understood your question correctly. Net-Metering can be selected in PV*SOL in the "Financial Analysis" section under "Energy Balance / Feed-in Concept".

image.png

Further information can be found in our corresponding online help section https://help.valentin-software.com/pvsol/en/pages/financial-analysis/#economic-efficiency-calculation-grid-connected. Does that answer your question or do you mean a specific functionality in net metering?

Kind regards
Mikio

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.