Hello,
I have two questions regarding some projects with the propose to full feed-in the energy to the grid.
I update today the PVSOL for de 2025 R3 version and this type of simulation has changed.
For exemple, I made a 2D simulation for 12 MW tracking and 4 MWh of battery. It usually charges de battery only from de PV when it starts do generate power and after the battery becames full, it feed-in the energy to the grid. The only shedule that I made is for discharging between 0:00 and 04:00 o'clock. I do not ativate charging periods.
With this update, sometimes to charge the battery it consumes from grid (charging from grid). I do not want that, How can I limit that?
Other question. It is possible to enable charging only after the PV Power became above the clipping power?