Hello. I am having problems because I want to simulate a grid-connected installation with batteries and I want to use a hybrid inverter. Once selected, it sends me directly to select the battery inverter and the batteries and I do not need a battery inverter because I am using a three-phase hybrid inverter to which the battery can be coupled. I need to know how to tell the software that it is a hybrid inverter. Can someone advise me? Thanks.