Jump to content

Lorton

Members
  • Posts

    4
  • Joined

  • Last visited

Lorton's Achievements

Newbie

Newbie (1/14)

  • First Post
  • One Month Later
  • Week One Done
  • Conversation Starter

Recent Badges

0

Reputation

  1. what settings do i need to change to show the battery being force charged from the grid?
  2. Is it possible to simulate a battery being force charged from the grid at optimal times when energy rates are at their cheapest?
  3. Hello. can i have some guidance on how to input export limitation on a design and how to know its reading right on a report. my design has an install a generation capacity of 170kW, but the export has to be limited to 40kW. I've added the 40kw on the AC main options to set the limitation, but on the report its still showing a lot of export back to the grid. i would assume it would only be showing the 40kw going back into the grid but in kwh? Lyon Leisure Limited PV Report Option 1 Rev E.pdf
  4. Lorton

    Battery Database

    Hello. I'm looking into large scale battery storage systems and i was wondering how often your product databases get updated? I'm in contact with FoxxEss who have created large scale batteries that aren't on the system. If i attach a datasheet, is it possible to see when these can be added? EN-G-MAX-Datasheet-V1.2-6.7 (fox-ess.com)
×
×
  • Create New...