  1. Hi, I'm trying to simulation an off-grid project which has 1315KWh annual constant load, 1.42kWp PV generator output and 5 batteries each has capacity at 100Ah. The days of autonomy of the batteries should be over 5 days. It's proposed to be an off-grid DC coupled system, as PV*SOL cannot simulate it at present so I chosed inverters for it in the software but with no meaning. The configuration of the system are showed below: When I tried to calculate and get the result something showed as follow: I've checked that the energy generated per year can cover the power consumption (about 2000 KWh>1315 KWh), how can I get the result of simulation? Thanks a lot Wen running 1.pvprj
×
×