Hello everyone,
I have such a problem with the installation of 250kwp , I am trying to achieve self-sufficiency above 80% while I pull out a maximum of 62.5%. Of course, I introduce consumption in the form of a hall (I design a gym) where the consumption is 120000kwh per year. Despite combinations with changing the hours of operation of the hall, for example, from 10 am to 6 pm, nothing helps, I can not cope with this and it is important for our customer to see the real consumption.
I want to add that the installation is without Battery !
Best regards and looking forward to advice