Hello, I am still working with a test version of PVSol. The following system is to be created:
12 solar panels á 450 Watt
1 inverter 5 kW (INVT BG5KTL)
The system is to operate completely as a 3-phase OnGrid system. I will therefore feed 2 groups of 6 panels into the inverter. I connect the 3-phase output of the inverter to my sub-distribution before the feed-in switch.
The procedure works very well here in Thailand. The unconsumed power is fed into the grid and the existing 3-phase meter turns backwards.
How do the parameters in PV-Sol have to be set so that the economic efficiency, payback period, balance sheet, etc. are correct at the end of the calculation of the total system.
Thank you very much for your help.
Mfg U. Z.