  1. klb

    Cable Plan

    Hello, I am simulating a new project and finalizing the stringing. When I try to edit the cable plan, the cable option tools are not available. I can't identify my total cable length because of this. Is this a bug? Please help me how to fix this. Thank you.
  2. Hi, I would like to know if I set the p-value to either P75 and P90, can I also download the yield result of the P75 and P90 value? So far I saw the p50 value result even I set it to either p75 or p90. I really need an answer for this since the bank requires the yield result of p90. Thank you.
  3. klb

    How to set the P value

    Hello, I'm sad hearing that since we offer PPA for our customers in C&I industries. We use their consumption to know if the yield is 100% consumed or not so we can adjust our design capacity for the offer. If we use P50 we have a very optimistic yield. Are there other way to set the parameters near P90 values? I have mentioned I tried to increase the losses but the difference in yield with P90 is still significant and I want to defend it to the top management. Thank you.
  4. klb

    How to set the P value

    I am aware of it. But, why I can't edit it on "Grid Connected PV System with Electrical Appliances"? The difference in the yield output is significant when we want to set the P value to P90. P50 is very optimistic even we try to increase the losses so that we can simulate a very conservative yield.
  5. I need assistance on how to set the P value in the latest version. I cannot find the bankability option in the financial analysis. I want to set it to P90 since the default value is P50. Thank you.
  6. klb

    Huawei BESS data

    Hello Frederik, Thank you for forwarding my request to the team responsible. How long it will take for the datebase to be updated? Best Regards.
  7. klb

    Huawei BESS data

    Hello, Can PVSol update the BESS components of Huawei in the database? They release their commercial and industrial BESS and also their iSitePowerM. If not possible, I hope users can import the file like for modules (PAN file) to the database because we cannot import files with the latest version. Because if I'm gonna simulate it in PVSol using Huawei solutions, I don't need battery inverter like in SMA since its integrated to the power modules that they have for their BESS solutions. I hope someone can assist me on this. Thank you.
  8. Hi Frederik, Thank you for taking notes on this, but can you add in PVSol with the latest models of huawei inverters in the next update? for example, the SUN2000-20KTL-M3 for three phase and the SUN2000-5KTL-L1 for single phase? Since I am not satisfy adding these 2 inverters manually and the simulation is not accurate as well. Best Regards.
  9. I would like to know if I can import an ond file of an inverter to the data base without manually putting all numbers? for example, the huawei sun2000-20KTL-M3 is not yet available for the simulation and our company supplier gave us an OND file of the said inverter. Kindly assist me if it is possible. Thank you. SUN2000-20KTL-M3-(20200916).ond
  10. klb

    Presentation

    I didn't noticed it, thank you for this!
  11. klb

    Presentation

    Hi, I don't want to include the financing in the presentation. But, when I already remove the check in the check box of the presentation in user data and remove the numbers (put zero in the input) in the financing part, but still in the presentation the financial analysis will still appear. Can you help me how to hide it in the presentation? Thank you
×
×